Inspection — Fuel Gauge/Water Temperature Gauge
EL-89flowchartFuel Gauge/Water Temperature Gauge Inspection
1
INSPECTION START
2
CHECK POWER SOURCE. 1) Turn ignition switch "ON". 2) Check voltage between terminal (A) and ground. Battery voltage should exist.
N.G.
Check the following items: 1) Harness continuity between battery terminal and combination meter. 2) Ignition relay 1. 3) Fusible link (65A) and fuse (10A). 4) Ignition switch operation and connections.
Check the following items: 1) Harness continuity between battery terminal and combination meter. 2) Ignition relay 1. 3) Fusible link (65A) and fuse (10A). 4) Ignition switch operation and connections.
O.K.
3
CHECK GAUGE OPERATION. 1) Turn ignition switch "ON". 2) Connect terminal (B) and (C) to ground with wire through 3.4W test bulb. (Test points are raised soldered terminals on f.p.c.b.) 3) Check operation of gauge. Gauge should move smoothly to full scale.
N.G.
Repair or replace gauge.
O.K.
4
Check harness continuity between component and combination meter (D) and (E).
N.G.
Repair or replace.
O.K.
5
CHECK COMPONENT. Check gauge units and harness. Refer to "Fuel Tank Gauge Unit Check" and "Thermal Transmitter Check".
N.G.
Repair or replace. Refer to FE section. (Fuel tank gauge unit)
O.K.
6
Reinstall any part removed.
INSPECTION END