Nissan Micra K11 silhouetteK11

STARTING SYSTEM — Starter — Armature Check (Cont'd), Bearing Check, Pinion Shaft Thrust Gap Check (Base K11)

EL-31prose procedure

Base K11 STARTING SYSTEM — armature mica undercut (>0.3mm/0.012in min), bearing-bush renewal (press out front+intermediate, soak new in oil 30min, press flush), pinion shaft thrust gap 'ℓ' check (per SDS, adjust if out of range). Figs SEL207P-209P, UEL033.

Armature Check (Cont'd)

Armature check (continued)

  1. 5
    Check depth of insulating mica from commutator surface. Less than 0.3 mm (0.012 in) ... Replace.

Bearing Check

Renew bearing bushes if there is: • evidence of armature fouling magnets. • perceptible side play between bush and shaft.

Bearing bush renewal

  1. 1
    Press worn out bushes from the Front and Intermediate brackets using lever/hand operated press and suitable mandrels. Soak new bushes in engine oil for 30 minutes before press fitting into position using a suitable press and mandrel.

Pinion Shaft Thrust Gap Check

Check movement 'ℓ' of pinion when it is pushed forward until it touches front bracket stopper. Movement 'ℓ': Refer to S.D.S. If movement 'ℓ' is not within specified range ... Adjust gap.

See also

S.D.S.

Search Manual

Search pages, specs, and procedures