STARTING SYSTEM — Wiring Diagram — LHD & RHD Model M/T (Base K11)
EL-23wiring diagramBase K11 STARTING SYSTEM wiring, M/T only (LHD UEL111 + RHD UEL112). Battery→starter via B/R heavy lead, ign-sw ST energizes solenoid through SMJ/connector splices, 30A fusible link. CVT variant separate. Equivalent to Supplement-VII EL-700x starting pages.
Wiring Diagram
LHD Model M/T
Starting system — LHD M/T (UEL111)
Components (7)
BatteryFusible Link Box (30A)Ignition Switch (5-terminal: OFF/ACC/ON/ST)S.M.J. (super multiple junction — refer to Foldout page)Connector M59 (main harness)Connector E55 (engine room harness LH)Starter Motor (with solenoid)
Connections (7)
Battery
BatteryStarter Motor (with solenoid)Black/Red (heavy starter lead)
BatteryFusible Link Box (30A)White/Green
Ignition Switch (5-terminal: OFF/ACC/ON/ST)
Ignition Switch (5-terminal: OFF/ACC/ON/ST)S.M.J. (super multiple junction — refer to Foldout page)Black/Yellow
Ignition Switch (5-terminal: OFF/ACC/ON/ST)S.M.J. (super multiple junction — refer to Foldout page)White/Black
S.M.J. (super multiple junction — refer to Foldout page)
S.M.J. (super multiple junction — refer to Foldout page)Connector E55 (engine room harness LH)Black/Yellow (via D2)
S.M.J. (super multiple junction — refer to Foldout page)Fusible Link Box (30A)White/Black (via D16)
Connector E55 (engine room harness LH)
Connector E55 (engine room harness LH)Starter Motor (with solenoid)Black/Yellow (Engine No.2 harness, solenoid pull-in)
RHD Model M/T
Starting system — RHD M/T (UEL112)
Components (10)
BatteryFusible Link Box (30A)Ignition Switch (5-terminal: OFF/ACC/ON/ST)Connector M60 (main harness)Connector E56 (engine room harness)Connector M2 (main harness)Connector E2 (engine room harness LH)Connector E59Connector E121Starter Motor (with solenoid)
Connections (9)
Battery
BatteryStarter Motor (with solenoid)Black/Red (heavy starter lead)
Ignition Switch (5-terminal: OFF/ACC/ON/ST)
Ignition Switch (5-terminal: OFF/ACC/ON/ST)Connector M60 (main harness)Black/Red
Ignition Switch (5-terminal: OFF/ACC/ON/ST)Connector M2 (main harness)White/Black
Connector M60 (main harness)
Connector M60 (main harness)Connector E56 (engine room harness)Black/Red
Connector M2 (main harness)
Connector M2 (main harness)Connector E2 (engine room harness LH)White/Black
Fusible Link Box (30A)
Fusible Link Box (30A)BatteryWhite/Green
Connector E56 (engine room harness)
Connector E56 (engine room harness)Connector E59Black/Red (engine room harness RH)
Connector E59
Connector E59Connector E121Black/Red
Connector E121
Connector E121Starter Motor (with solenoid)Black/Red (Engine No.2 harness, solenoid)
NOTE
Base K11 starting-system wiring for M/T models, both hands of drive. Topology is identical: battery feeds the starter motor solenoid via a heavy B/R lead; the ignition switch ST position energizes the solenoid pull-in through the SMJ/connector splices. Fusible link box (30A) protects the battery feed. LHD routes through M59/E55 + SMJ (D2/D16); RHD routes through M60/E56 (B/R) and M2/E2 (W/B), with E59/E121 on the engine-room RH harness. The N·CVT starting-system variant (with inhibitor relay) is on a separate page.
Ignition switch state-table: ST (start) position closes the terminals that feed the starter solenoid. The 5-terminal table (rows 1-5 × OFF/ACC/ON/ST columns) matches the EL-8 power-supply-routing ignition switch.
See also
S.M.J. Foldout page
