Nissan Micra K11 silhouetteK11

DTC P0720 OUTPUT PULLEY SPEED SENSOR CVT - Component Inspection

AT-7070prose procedure

Component Inspection

OUTPUT PULLEY SPEED SENSOR

  1. 1
    Jacking up the vehicle.
  2. 2
    Check voltage between output pully sensor terminal.
    Component inspection setup: voltage check at output pulley speed sensor connector E148 terminals 1, 2, 3 with voltmeter, plus CONSULT-II connected to data link connector via DDL with PULSE cable to connector F61 terminals 1, 2, 3.
    NAT329
  3. 3
    Check pulse by using the pulse measurement function of CONSULT-II when front wheel rotating.

Search Manual

Search pages, specs, and procedures