TROUBLE DIAGNOSES FOR SELF-DIAGNOSTIC ITEMS — Diagnostic Procedure 3 (Motor Relay or motor) (Cont'd)
BR-7039flowchartDiagnostic Procedure 3 (Motor Relay or motor) (Cont'd)
Diagnostic Procedure 3 — branch A (Fusible link)
1
(A) — Continued from previous page
2
REPLACE.
Replace fusible link.
Does the fusible link blow out when ignition switch is turned ON?
NG
Inspection end
OK
3
B — CHECK ABS ACTUATOR MOTOR POWER SUPPLY CIRCUIT.
1. Disconnect battery cable and ABS actuator and electric unit connector (E96).
2. Check continuity between ABS actuator and electric unit connector (E96) (body side) terminal 17 and ground.
Continuity should not exist.
NG
Check the following
Check the following
• Harness connector (E96)
• Harness for open or short between ABS actuator and electric unit and fusible link
If NG, repair harness ro connector.
OK
4
CHECK HARNESS CONNECTOR.
Check ABS actuator and electric unit pin terminals for damage or the connection of ABS actuator and electric unit harness connector.
Reconnect ABS actuator and electric unit harness connector. Then retest.
