EXHAUST SYSTEM
FE-10parts diagramUnverifiedDifferent center-pipe assemblies are used for CG10DE vs CG13DE engines.
CAUTION
Always replace exhaust gaskets with new ones when re-assembling.
Check all tube connections for exhaust gas leaks, and entire system for unusual noises, with engine running.
After installation, check that mounting brackets and mounting insulator are free from undue stress. If any of the above parts are not installed properly, excessive noise or vibration may be transmitted to the vehicle body.
Parts DiagramFig. fig1

| Specification | Value |
|---|---|
| Muffler hanger / rear mount fastenerTightening torque (top-right callout) | 13 - 16N·m |
| Centre pipe flange fastenerTightening torque | 43 - 55N·m |
| Muffler-to-centre pipe flange fastenerTightening torque | 30 - 39N·m |
| Centre pipe support bracket fastenerTightening torque | 43 - 55N·m |
| Support bracket small boltTightening torque | 13 - 16N·m |
| Mounting insulator fastenerTightening torque | 43 - 55N·m |
| Small bracket fastenerTightening torque | 5.0 - 6.5N·m |
| Front-pipe flange fastenerTightening torque | 43 - 55N·m |
Muffler hanger / rear mount fastenerTightening torque (top-right callout)
13 - 16N·m
Centre pipe flange fastenerTightening torque
43 - 55N·m
Muffler-to-centre pipe flange fastenerTightening torque
30 - 39N·m
Centre pipe support bracket fastenerTightening torque
43 - 55N·m
Support bracket small boltTightening torque
13 - 16N·m
Mounting insulator fastenerTightening torque
43 - 55N·m
Small bracket fastenerTightening torque
5.0 - 6.5N·m
Front-pipe flange fastenerTightening torque
43 - 55N·m
NOTE
Legend: torque values are in N·m (kg-m, ft-lb).
